- Joined
- Dec 25, 2009
- Messages
- 17,416
I work for these guys:
http://www.blackmagicdesign.com/products/
Bally whatsit, I understood the video bit, lost the rest, Rick
I work for these guys:
http://www.blackmagicdesign.com/products/
Bally whatsit, I understood the video bit, lost the rest, Rick
MAF update all built and tested, just got to put in a box with some flying connections. I should get it to you sometime next week.
that would be great, just in time for Slindon on the 26th but no sweat if not, Rick
As Stinky says Belfasts are the devils sink complete and utter ballox. Walk away mate or get them to sign a disclaimer. It wont stay sealed for long and WILL look shit in 6 weeks exactly :doh
Bloody Cuntry Living my arse :banghead
Stinka/Makeitfit, don't suppose you fancy a few weeks down here is sunny Sussex in the summer, if Planning is granted, got a project to do that will require your skills, timber brewery in the middle of nowhere have not seen the plans yet but customer is of 30 plus years standing, Rick
Rick if you do the job and have to butt up the tops to the side of the sink and the back etc. I'd consider sealing the w/top to sink interface with epoxy. You can get coloured tiling epoxy grout that will do quite a nice job on iroko.
Then oil the hell out of it once it's cured.
Dont forget to oil under sides of w/tops too
Possibly mate, just let me know as it comes up cheers
Blasted this together from 20 sheets of mdf in 3 days this week
Couple of things I would have done differently if the guy wasn't in such a hurry, but for 3 days work I'm happy with the result
looks tidy mate:thumb2
Enter your email address to join: