- Joined
- Feb 9, 2008
- Messages
- 6,822
First make sure you have got everything you need
Next I lined up the template.
i put pilot holes in first and checked they looked ok before i drilled out the holes.
i used a 9mm drill for the mounting holes.
i didnt have a holesaw big enough so i used the jigsaw with a metal cutting
blade.taped up the bottom to stop it scratching.
cleaned up the hole with a file.
put some rubber edging around the hole.
couldnt get up under the wing so i unbolted it across the top and behind the door.i was then able to lift it away to give me enough room to tighten up the nuts.
i then attached my flxi hose to the rubber hose that fits to the back of the snorkel body.
i had to make the hole in the inner wing a bit bigger so i could feed the flexi hose through into the engine bay.
cleaned up the hole and put some rubber edging on it.
next i fastened the rubber hose to the snorkel body and fed the flexi hose into the engine bay.
now it was time to mod the air box.i cut a 3"diameter hole and welded in a peice of 3"diameter tube.
next i blanked off the old air box intake.
i put the airbox back in and connected up the flexi hose.
by this time it was dark so i will put some paint and tiger seal on the joints and check it for leaks in the morning.
not too bad a job to fit,i need to modify the bracket that fits to the a pillar and fit it in the daylight.
« Last Edit: December 29, 2013, 06:56:15 PM by elty001 »
Report to moderator 92.3.122.146
2000 nissan terrano II 2.7tdi se + auto.
2"spring spacer lift.35mm wheel spacers.
31.10.50.15 khumo kl71 muds on black steelies.
Stainless bling
http://www.the4x4ownersclub.co.uk/index.php?topic=1404.0
Next I lined up the template.
i put pilot holes in first and checked they looked ok before i drilled out the holes.
i used a 9mm drill for the mounting holes.
i didnt have a holesaw big enough so i used the jigsaw with a metal cutting
blade.taped up the bottom to stop it scratching.
cleaned up the hole with a file.
put some rubber edging around the hole.
couldnt get up under the wing so i unbolted it across the top and behind the door.i was then able to lift it away to give me enough room to tighten up the nuts.
i then attached my flxi hose to the rubber hose that fits to the back of the snorkel body.
i had to make the hole in the inner wing a bit bigger so i could feed the flexi hose through into the engine bay.
cleaned up the hole and put some rubber edging on it.
next i fastened the rubber hose to the snorkel body and fed the flexi hose into the engine bay.
now it was time to mod the air box.i cut a 3"diameter hole and welded in a peice of 3"diameter tube.
next i blanked off the old air box intake.
i put the airbox back in and connected up the flexi hose.
by this time it was dark so i will put some paint and tiger seal on the joints and check it for leaks in the morning.
not too bad a job to fit,i need to modify the bracket that fits to the a pillar and fit it in the daylight.
« Last Edit: December 29, 2013, 06:56:15 PM by elty001 »
Report to moderator 92.3.122.146
2000 nissan terrano II 2.7tdi se + auto.
2"spring spacer lift.35mm wheel spacers.
31.10.50.15 khumo kl71 muds on black steelies.
Stainless bling
http://www.the4x4ownersclub.co.uk/index.php?topic=1404.0