With a bit of help from the father-in-law doing my welding, I've managed to get a few jobs ticked on my 'to do' list.
We did use full 50x50mm box until I went to refit the bumper:augie had to chop some out of the uprights :lol
Managed to sort LCD display out :clap
And replaced the very worn front arb drop links with new and also upgraded to full poly bushes on front arb :thumbs
I also noticed that the n/s/f body mount needs a bit of welding, so that will be sorted as soon as father-in-law can make up my repair template in steel and weld it me in place. :thumb2
The advice I received for the LCD repair alone saved me mega bucks. That's why I didn't mind paying for membership before I made a single post.
Thanks people :clap
Shaun.
We did use full 50x50mm box until I went to refit the bumper:augie had to chop some out of the uprights :lol
Managed to sort LCD display out :clap
And replaced the very worn front arb drop links with new and also upgraded to full poly bushes on front arb :thumbs
I also noticed that the n/s/f body mount needs a bit of welding, so that will be sorted as soon as father-in-law can make up my repair template in steel and weld it me in place. :thumb2
The advice I received for the LCD repair alone saved me mega bucks. That's why I didn't mind paying for membership before I made a single post.
Thanks people :clap
Shaun.