Well, after a few weeks work (little by little) all the jobs are done.
Such as:
- Install Winch
- Move the control box to the engine bay
- Install a relay for the winch (12V 200A) controlled from inside
- Install front and rear cameras
Like my daughter told me, this Maverick is hold together with zip ties... lot's of them...