Paff
Well-known member
- Joined
- Apr 17, 2014
- Messages
- 1,094
Right defo not 4x4 related.
I want to sort out a car parking space, at the moment it is paving slabs that bounce about when you run over them as the base was never sorted and is very soft, also a couple of areas on the gravel drive which sink in when it's wet.
I am thinking about digging down about 6 inches, whacking down some MOT type 1. Then do I lay down 2 inches of sand on top of the base to level for the slabs?
I have ordered the MOT type 1 and sand to arrive on Monday, so I will dig out over the weekend. Then pick up a whacker on Tuesday.
As I have never done this before, any advice would be great :thumb2
I want to sort out a car parking space, at the moment it is paving slabs that bounce about when you run over them as the base was never sorted and is very soft, also a couple of areas on the gravel drive which sink in when it's wet.
I am thinking about digging down about 6 inches, whacking down some MOT type 1. Then do I lay down 2 inches of sand on top of the base to level for the slabs?
I have ordered the MOT type 1 and sand to arrive on Monday, so I will dig out over the weekend. Then pick up a whacker on Tuesday.
As I have never done this before, any advice would be great :thumb2