|
The Clubs Virtual Pub For general chat, so come on in and pull up a chair. |
|
Thread Tools | Display Modes |
25-03-2018, 12:20 | #1 |
Senior Member
Join Date: Aug 2008
Location: Derby
Vehicle: Freelander & Jeep GC 3.0
Posts: 4,416
|
Some house fire rebuild pictures.
20180320_170151 by Ted Bagshaw, on Flickr
20180320_165859 by Ted Bagshaw, on Flickr 20180320_165821 by Ted Bagshaw, on Flickr 20180313_172420 by Ted Bagshaw, on Flickr We had our first monthly site meeting at our house last Wednesday with the Contractor, Architect & my Loss Assessor. It went quite well just need some good weather now so they can do the full roof strip and re-tiling etc. The upstairs stripping out is pretty much completed as is downstairs. I am quite impressed with the new roof insulation prior to plastering. The internal plaster board is already backed with 2" thick Kingspan type insulation so should be much better than it was. |
25-03-2018, 12:32 | #2 |
Senior Member
Join Date: Sep 2004
Location: UK
Posts: 12,965
|
All seems very positive for you at last, think of the lower bills with a bit of luck too. Only what you deserve after such a traumatic experience.
|
25-03-2018, 12:34 | #3 |
Senior Member
Join Date: Oct 2014
Location: Gone.
Vehicle: Terrano ii
Posts: 2,215
|
Great news that things are moving forward.
|
Thread Tools | |
Display Modes | |
|
|